Materials
March 16 - The bricks are waiting to be laid. The parts of the foundation that will be above ground will be bricked. This includes the entire back wall, which will actually be framed. I guess I should say any exposed wall lower than the first floor will be bricked.
March 22 - Here's a bunch of beams. Apparently, there will be three beams running the entire length of the house. They've backfilled against the foundation and filled in the trenches for the gas, water and sewer lines.
March 23 - Here's our shower. It still seems strange to see a shower sitting outside. They've framed the back wall of the basement. Pictures are on the next page.
|